This senior housing community, completed in 2015, consists of one level of subterranean parking, a post-tension structural concrete podium deck, and 3-levels of senior housing above. The elevator & stair tower core is constructed in structural concrete up to the roof level. With an open courtyard located in the center of the project, an oak tree to protect, and only one point of access, this project posed many challenges that we overcame to successfully complete our scope expeditiously and on time.